Manually change Ion Chef™ Instrument run status
An Ion Chef™ Instrument run must have a status of Planned before a sequencer can start a sequencing run. If the connection between an Ion Chef™ Instrument and Torrent Suite™ Software is temporarily lost or interrupted, the status of the Ion Chef™ run may be marked as Reserved, even if the run has completed. To resolve this problem, you can manually change the status to Planned and enable the run for sequencing.